beautypg.com

0 fault finding, Go to next page – Baxi Potterton 80 HE User Manual

Page 44

background image

44

14.0

Fault Finding

Turn selector to

neon illuminated.

Turn Central Heating

thermostat to maximum.

neon illuminated.

Go to section ‘A’.

neon flashing

Go to section ‘B’.

External controls calling for

heat and where fitted, internal

clock calling for heat.

Ensure controls are set to

demand and verify the contacts

are closed.

NO

Central Heating - Follow operational sequence

Primary water is diverted from

preheating circuit to CH

system.

neon illuminated.

Primary flow switch operated.

Pump runs.

Fan runs at max speed.

Air pressure switch proved.

Spark at ignition electrodes for

up to 10 seconds.

neon illuminated.

Burner extinguishes after 10

seconds.

Preheating function starts after

25 seconds.

neon flashing

(see DHW preheating

function).

Primary water is diverted from

preheating circuit to CH

system.

neon illuminated.

Go to section ‘M’.

neon flashing

Go to section ‘B’.

neon flashing

Go to section ‘C’.

neons flashing

Go to section ‘D’.

Turn the selector to reset.

If regular resetting is required

or appliance still does not

operate investigation is

necessary.

Go to section ‘J’ & ‘O’.

NO

YES

neon flashing

Go to section ‘E’.

neon flashing.

Turn selector to the reset

position. If the neon does not

extinguish go to sections H and

K.

Change main PCB.

Go to section ‘F’.

neon flashing

Go to section ‘I’ & ‘N’.

Preheat control is not at

minimum position. External

control calling for heat.

Go to section ‘L’.

Go to section ‘M’.

YES

NO

YES

NO

YES

NO

YES

NO

YES

NO

YES

YES

YES

NO

NO

NO

YES

YES

NO

YES

NO

NO

YES

NO

YES

neon flashing

NO

Go to next page