beautypg.com

0 technical data – Baxi Potterton 80 HE User Manual

Page 10

background image

4.0 Technical Data

10

4.2

Combi Instant 105 HE

Temperatures
C.H. Flow Temp

(adjustable)

35°C to 85°C

max

(± 5°C)

D.H.W. Flow Temp

35°C to 65°C

max

(± 5°C)

dependent upon flow rate
50°C Pre-heat OFF
65°C Pre-heat ON ± 5°C
dependent upon flow rate

This value is used in the UK Government’s Standard Assessment

Procedure (SAP) for energy rating of dwellings. The test data from

which it has been calculated have been certified by 0051.

SEDBUK Declaration For Combi Instant 105 HE

The seasonal efficiency (SEDBUK) is 87.3% (89.4% LPG)

Band B

0

200

400

600

800

1000

1200

0.5

1

1.5

2

2.5

3

3.5

4

Metre (wg)

Flow Rate (l/h)

Pump - Available Head

0

5

4.5

Heat Input CH

Max

Min

kW

30.5

11.9

Heat Output CH (Non-Condensing)

Max

Min

kW

29.6

11

Electrical Supply

230V~ 50Hz

(Appliance must be connected to an

earthed supply)

Power Consumption

180W

External Fuse Rating

3A

Internal Fuse Rating

Fuse 2A Fast Blow to BS 4265

Appliance Category

CAT II

2H 3P

Inlet Pressure (Natural Gas - G20)

mbar

20

Burner Injector (Natural Gas - G20)

15 x 1.25mm Diameter

Burner Pressure

(Natural Gas - G20)
Max Rate Min Rate

mbar

12.1 ± 0.5

2.1 ± 0.2

Appliance Type

C

12

C

32

Heat Output CH (Condensing)

Max

Min

kW

31

11.3

Heat Input DHW

Max

kW

30.5

Heat Output DHW

Max

kW

29.6

Flue Terminal

Diameter

100mm

Dimensions

Projection

125mm

Outercase Dimensions
Casing Height

-

780mm

Overall Height Inc Flue
Elbow

-

965mm

Casing Width

-

450mm

Casing Depth

-

345mm

Clearances
Above Casing

200 mm Min

Below Casing

200 mm Min

Front

450 mm Min

(For Servicing)

Front

5 mm Min

(In Operation)

L.H. Side

5 mm Min

R.H. Side

5 mm Min

(In Operation)

20 mm Min

(See Note*)

*NOTE: The boiler can be operated with a
clearance of 5mm at the right. This is also sufficient
for routine maintenance. However a clearance of
20mm is required if it is necessary to remove the
secondary heat exchanger. This should be
considered when siting the appliance and in the
event of any subsequent alterations in the area of
installation

Weights

kg

Packaged Boiler Carton

57.5

Installation Lift Weight

47

Connections

copper tails

Gas Supply

-

22mm

Central Heating Flow

-

22mm

Central Heating Return

-

22mm

Cold Water Mains Inlet

-

15mm

DHW Flow

-

15mm

Pressure Relief Discharge

-

15mm

NOx Class

3

Electrical Protection

IPX5D

Condensate Drain

1” BSP

LPG Propane - G31

Burner Injector 15 x 0.77mm diameter

Burner Pressure
Propane

mbar

Inlet Pressures

mbar

Max Rate

32.3 ± 0.5

Min Rate

5.2 ± 0.2

37

Central Heating Primary Circuit
Pressures

bar

Safety Discharge

3

Max Operating

2.5

Min Operating

0.5

Recommend Operating

1-2

DHW Circuit

bar

Pressures
Max Operating

8

Min Operating

0.2

Min Operating Pressure
at 13.2 l/min

0.96

Flow Rates

l/min

DHW Flow Rate
@ 30°C Rise

14.1

DHW Flow Rate
@ 35°C Rise

12.1

Min Working
DHW Flow Rate

2.5

Pump
Available Head

See graph below

Expansion Vessel

- (For Central Heating only.

Integral with appliance)

bar

Min Pre-charge Pressure

0.5

litre

Max Capacity of
CH System

80

Primary Water Content

3.2

of Boiler (unpressurised)

Max Gas Rate

(Natural Gas - G20)
(After 10 mins)

m

3

/h

3.22