beautypg.com

0 completion – Baxi Potterton 80 HE User Manual

Page 28

background image

10.0

Completion

28

10.1

Completion

1. Hinge the facia panel upwards and refit the case

front panel. Tighten the securing screws (Fig. 38).

2. Instruct the user in the operation of the boiler and

system, explaining the operational sequence.

3. Carefully read and complete all sections of the

Benchmark Commissioning Checklist at the rear of this

publication that are relevant to the appliance and

installation. These details will be required in the event

of any warranty work. The publication must be handed

to the user for safe keeping and each subsequent

regular service visit recorded.

4. For IE, it is necessary to complete a “Declaration of

Conformity” to indicate compliance with I.S. 813. An

example of this is given in I.S. 813 “Domestic Gas

Installations”. This is in addition to the Benchmark

Commissioning Checklist.

5. Hand over the Users Operating, Installation and

Servicing Instructions, giving advice on the necessity of

regular servicing.

Fig. 38

Facia Panel

Case Front Panel