Unpacking your battery cabinet, Preparing your site, Environmental considerations – Powerware 685 User Manual

Page 11: Preparing for wiring the battery cabinet

background image

5

Powerware 9350 Series 685 and 1085 Auxiliary Battery Cabinets

Installation Manual

164201408 Rev. P00 053002

Unpacking Your Battery Cabinet

Each Powerware 9350 Series 685 or Series 1085 Battery Cabinet is shipped

on a separate pallet. Use a forklift or pallet jack to move the packaged cabinets

to the installation site, or as close as possible to the site, before you unload them

from the pallets.
Battery cabinets must be installed in accordance with all applicable codes and

regulations, including the National Electrical Code (NEC), Article 480.

NOTE: Startup and operational checks should be performed only by authorized

service personnel. This service is offered as part of the sales contract for

your battery system.

Preparing Your Site

The basic environmental requirements for the battery system are:

Ambient Temperature Range:

10---40˚C (50---104˚F)

Recommended Operating Range: 20---25˚C (68---77˚F)
Maximum Relative Humidity:

95% noncondensing

The Series 685 or Series 1085 Battery Cabinets use convection cooling to regulate

internal component temperature. Air inlets are in the bottom and top of the

cabinets. You must allow a minimum clearance of 305 mm (12 in.) above each

cabinet for proper air circulation. Additionally, a clearance of 915 mm (36 in.) must

be provided in front of the cabinet for component removal and maintenance .

Maintaining this clearance provides adequate airflow to the front of the cabinet.

Environmental Considerations

The life of the battery system is adversely affected if the installation does not meet

these guidelines:

The battery cabinet must be installed on a sealed concrete pad

or a sealed concrete floor, or on a raised computer room floor.

The battery cabinet must be installed in a dust-free, nonconductive

environment.

The battery cabinet must be installed in a humidity-controlled environment.

Preparing for Wiring the Battery Cabinet

For external wiring requirements, including the minimum AWG size of external

wiring, refer to Appendix A, Table C.