beautypg.com

Location and mounting requirements, Installing the gateway router, Mounting the gateway router – Patton electronic 4110 User Manual

Page 35: Connecting cables

background image

Installing the gateway router

35

Model 4520 & 4110 Series Getting Started Guide

3 • Installation

Location and mounting requirements

The SmartNode router is intended to be placed on a desktop or similar sturdy, flat surface that offers easy
access to the cables. Allow sufficient space at the rear of the chassis for cable connections. Additionally, you
should consider the need to access the unit for future upgrades and maintenance.

Installing the gateway router

SmartNode gateway router installation consists of the following:

Placing the device at the desired installation location (see section

“Mounting the gateway router”

on

page 35)

Installing the interface and power cables (see section

“Connecting cables”

on page 35)

When you finish installing the SmartNode, go to chapter 4,

“Getting started with the SmartNode”

on page 41.

Mounting the gateway router

Place the router on a desktop or similar sturdy, flat surface that offers easy access to the cables. The router
should be installed in a dry environment with sufficient space to allow air circulation for cooling.

Note

For proper ventilation, leave at least 2 inches (5 cm) to the left, right, front,
and rear of the SmartNode gateway router.

Connecting cables

Installing router cables takes place in the following order:

1. Installing the RJ-11 voice port (FXS) cable or cables (see “Installing an interface cable on the router’s FXS

interface port”)

2. Installing the 10/100 Ethernet port cable or cables (see

“Installing the Ethernet cable”

on page 38)

3. Installing the power input (see

“Installing the power cord”

on page 40)

Do not work on the system or connect or disconnect cables during periods of
lightning activity.