7 ventilation – Liebert UPS System User Manual
Page 25

Chapter 2 Cabinet Installation
19
Input cable
Battery cable
Output cable
Signal cable
Fig. 2-9 UPS top cable output
2.7 Ventilation
The cooling air comes into the UPS from the bottom and the fan circulates the cool
air inside the UPS. The air is expelled out of the UPS from the back.
Table 2-3 shows the relationship between the power consumed and air intake.
The rear clearance required by the UPS is 500 mm. The front clearance required is
1 m for the convenient of door opening and maintenance, shown in Figure 2-10.
Battery cabinet
UPS cabinet
bottom board
Fig. 2-10 Relative position of cabinet
See also other documents in the category Liebert Tools:
- PS250-50S (12 pages)
- SGH STEAM SL-14050 (16 pages)
- Ship-Ahead Input/Output Cabinet NXL (20 pages)
- NfinityTM (44 pages)
- 4000 (59 pages)
- 230V (40 pages)
- PSP (32 pages)
- UPStation GXT (20 pages)
- UPSTATION GXT 2U (38 pages)
- UPS Systems PSI XR (32 pages)
- 600TTM (91 pages)
- Series 600T (128 pages)
- GXT2 - 3X1 (42 pages)
- Nfinity (44 pages)
- PowerSure PSA 350VA to 1000VA (8 pages)
- 2U (16 pages)
- PDUTM (156 pages)
- GXT2-6000 RT208 (52 pages)
- PowerSure Personal (12 pages)
- 2700VA (40 pages)
- Series 610 (44 pages)
- Emerson NX UPS System (88 pages)
- GXT 2U (44 pages)
- UPStation S VM12000 (38 pages)
- 1000kVA (120 pages)
- Nfinity 208 V / 240 V 60Hz (45 pages)
- UPS (28 pages)
- PowerSure PSI 1000 - 3000VA 60 Hz 120V (36 pages)
- GXT2-4500RT230 (40 pages)
- GXT2-6000RTL630 (44 pages)
- IntelliRack (2 pages)
- PowerSure PSA 350-1000VA (2 pages)
- 350-700 VA (11 pages)
- 500-650 VA (24 pages)
- PowerSure PS250-60S (13 pages)
- 130 kVA (102 pages)
- 30-130kVA (112 pages)
- GXT (23 pages)
- PSITM (34 pages)
- 600T (88 pages)
- 600T (73 pages)
- 610 (104 pages)
- GXTTM (30 pages)
- 700-3000 VA (30 pages)