beautypg.com

Maintenance, Cleaning boiler heat exchanger – Lochinvar Sync Condensing Boiler 1 User Manual

Page 61

background image

61

Installation & Operation Manual

11

Maintenance

(continued)

The boiler contains ceramic fiber materials.
Use care when handling these materials
per instructions on page 62 of this manual.
Failure to comply could result in severe
personal injury.

ƽ WARNING

Cleaning boiler heat exchanger

For recommended materials; including brush, appropriate
extension(s), refractory cover, and detailed instructions see
Table 11B - Heat Exchanger Cleaning Kits.

1. Shut down boiler:

• Follow the “To Turn Off Gas to Appliance” instructions
for the boiler in Section 9 - Startup.
• Do not drain the boiler unless it will be exposed to
freezing temperatures. If using freeze prevention fluid
in system, do not drain.

2. Allow time for the boiler to cool to room temperature if it

has been firing.

3. Remove the nuts securing the heat exchanger access cover

to the heat exchanger and set aside.

4. Remove the heat exchanger access cover, burner, and

gas/air arm assembly.

5. Remove the condensate hose from the heat exchanger end.

Connect a field supplied 3/4" diameter hose to a drain pan.
Using field supplied means, cover the refractory in the back
of the combustion chamber of the heat exchanger.

6. Use a vacuum cleaner to remove any accumulation on the

boiler heating surfaces. Do not use any solvent.

7. Brush the heat exchanger while dry using a nylon bristle

brush. Caution: DO NOT use a metal brush. Re-vacuum
the heat exchanger.

8. Finish cleaning using a clean cloth dampened with warm

water. Rinse out debris with a low pressure water supply.

9. Allow the heat exchanger to thoroughly dry.

10. Remove the field supplied rear refractory cover from the

back of the combustion chamber of the heat exchanger and
reassemble.

11. Close isolation valves on piping to isolate boiler from

system. Attach a hose to the boiler drain and flush boiler
thoroughly with clean water by using purging valves to
allow water to flow through the water make-up line to the
boiler.

12. Perform start-up and check-out procedures in the Check

Flame and Combustion - Section 9 - Startup on pages 45
and 47 of this manual.

13. Replace the access cover and restore boiler to operation.

Table 11B Heat Exchanger Cleaning Kits

Model

Number

Kit

Number

Part

Number

Component

Description

SB 1.0 - 1.5 KIT30064

MSC20083* Nylon 4" Wheel Brush*

MSC20085 1/4" x 12" Drill Extension

MSC20086 1/4" x 24" Drill Extension

* Do NOT use a metal brush. Only use
the kit provided brush or an equivalent
replacement nylon brush.

ƽ CAUTION

NOTICE

Rope gasket is intended for sealing combustion
(FIG. 11-3). If damaged DO NOT reuse, the
heat exchanger door must be replaced. Consult
factory for replacement heat exchanger door
(kit WTR3086).

ROPE GASKET

CAUTION:

IF GASKET IS DAMAGED

DO NOT REUSE, THE HEAT EXCHANGER DOOR
MUST BE REPLACED.

Figure 11-3 Rope Gasket - Heat Exchanger Door