Sidewall direct venting

(continued)

All vent pipes and air inlets must
terminate at the same height to avoid
possibility of severe personal injury,
death, or substantial property damage.

Multiple vent/air terminations

1. When terminating multiple SYNC boilers terminate

each vent/air connection as described in this manual
(FIG. 3-5A).

2. Place wall penetrations to obtain minimum clearance of

12 inches (305 mm) between vent pipe and adjacent air
inlet elbow, as shown in FIG. 3-5A for U.S. installations.
For Canadian installations, provide clearances required by
CSA B149.1 Installation Code.

3. The air inlet of a SYNC is part of a direct vent connection.

It is not classified as a forced air intake with regard to
spacing from adjacent boiler vents.

ƽ WARNING

12" MIN. BETWEEN EDGE OF AIR

INLET AND ADJACENT VENT OUTLET

VENT / AIR

TERMINATION

VENT

AIR

Figure 3-5A Multiple Vent Terminations (must also
comply with Figure 3-1A)

VENT

12” (305 MM) MIN
15” (381 MM) MAX

12” (305 MM) MIN. BETWEEN EDGE
OF AIR PIPE AND ADJACENT VENT
PIPE

AIR

Figure 3-5B Alternate Multiple Vent Terminations w/Field
Supplied Fittings (must also comply with Figure 3-1B)

Prepare wall penetrations (Alternate

Field Supplied Options)

1. Air pipe penetration (see FIG. 3-4B):

a. Cut a hole for the air pipe. Size the air pipe hole as

close as desired to the air pipe outside diameter.

2. Vent pipe penetration (see FIG. 3-4B):

a. Cut a hole for the vent pipe. For either combustible

or noncombustible construction, size the vent pipe

hole with at least a 1/2 inch clearance around the vent

pipe outer diameter:

• 7½ inch (178 mm) hole for 6 inch (152 mm) vent

pipe

• 8½ inch (203 mm) hole for 7 inch (178 mm) vent

pipe


b. Insert a galvanized metal thimble in the vent pipe

hole (when required by local codes).

3. Use a sidewall termination plate as a template for correct

location of hole centers.

4. Follow all local codes for isolation of vent pipe when

passing through floors or walls.

5. Seal exterior openings thoroughly with exterior caulk.

SIDEWALL

TERMINATION PLATE

VENT

PIPING

GALVANIZED
THIMBLE

(WHEN REQUIRED BY LOCAL CODES)

ELBOW

ELBOW

AIR PIPING

BIRD SCREEN

BIRD SCREEN

Figure 3-4C Alternate Sidewall Termination Assembly
PVC/CPVC or Stainless Steel