beautypg.com

Slant/Fin V-33 User Manual

Page 3

background image

V

ICTORY

3

INSTALLATION REQUIREMENTS
The installation must conform to the requirements of the

authority having jurisdiction or, in the absence of such

requirements, to the National Fuel Gas Code, ANSI Z223.1-

latest edition.

This installation must also conform to the additional require-

ments in this Slant/Fin instruction book.

NATURAL GAS FIRED BOILER LOCATION
Provide a level, solid foundation for the boiler. Location

should be as near as possible to chimney or outside wall so

that the flue pipe from boiler is short and direct. (See

Appendix B for vent terminal location restrictions.)

The location should also be such that the gas ignition sys-

tem components are protected from water (dripping, spray-

ing, rain, etc.) during appliance operation and service (circu-

lator replacement, condensate trap, control replacement,

etc.).

WARNING

LIQUEFIED PETROLEUM (L.P.) PROPANE FIRED GAS

BOILER LOCATION

REQUIRES SPECIAL ATTENTION

Liquefied Petroleum (L.P.) propane gas is heavier than air.

Therefore, propane boilers, piping, valves must NOT be

installed in locations where propane leaking from defective

equipment and piping will "pool" in a basement or other

space below the leak.

A spark or flame from the boiler or other source may ignite

the accumulated propane gas causing an explosion or fire.

Provide a level, solid foundation for the boiler. Location

should be as near the chimney as possible so that the flue

pipe from boiler to chimney is short and direct.
The UNIFORM MECHANICAL CODE may be in effect in

your geographic area.
The following precautions are cited by the 1994 UNIFORM

MECHANICAL CODE, section 304.6:

"LPG Appliances. Liquefied petroleum gas-burning
appliances shall not be installed in a pit, basement or

similar location where heavier-than-air-gas might collect.

Appliances so fueled shall not be installed in an above-

grade under-floor space or basement unless such loca-

tion is provided with an approved means for removal of

unburned gas."

Consult Chapter 5 of the 1994 UNIFORM MECHANICAL

CODE for design criteria of the "approved" means for

removal of unburned gas.

BOILER FOUNDATION
A. Provide a solid, level foundation, capable of supporting

the weight of the boiler filled with water, and extending at

least 2" past the jacket on all sides. See dimensions of

boilers, page 2.

B. For installation on non-combustible floors only*.

C. If boiler is to be located over buried conduit containing

electric wires or telephone cables, consult local codes or

the National Board of Fire Underwriters for specific

requirements.

* Installation on combustible flooring allowed only with proper Com-

bustible Floor Kit. Kit part number is printed on boiler rating plate.

In no case may the boiler be installed on carpeting.

MINIMUM CLEARANCES FROM COMBUSTIBLE

CONSTRUCTIONS

A. Minimum boiler clearances shall be as follows:

VICTORY BOILER

MINIMUM CLEARANCE FOR COMBUSTIBLE CONSTRUC-

TION.

MINIMUM ALCOVE AND CLOSET CLEARANCE.

Front 6"

Rear 6"

Left Side

6"

Right Side

12"

Top (above boiler)

12"

Flue Connector

6"

B. Provide accessibility clearance of 24" on sides requiring

servicing and 18" on sides used for passage.

C. All minimum clearances shown above must be met. This

may result in increased values of some minimum clear-

ances in order to maintain the minimum clearances of

others.

D. Clearance from hot water pipes shall be 1 inch**.

** At points where hot water pipes emerge from a floor,

wall or ceiling, the clearance at the opening through

the finished floor boards or wall or ceiling boards may

be not less than 1/2 inch. Each such opening shall be

covered with a plate of uncombustible material.

SAFETY

KEEP THE BOILER AREA CLEAR AND FREE FROM

COMBUSTIBLE MATERIALS, GASOLINE AND OTHER

FLAMMABLE VAPORS AND LIQUIDS.

FLUE GAS VENTING REQUIREMENTS
The Victory series boiler is a high efficiency, mechanically

induced draft boiler and, therefore, requires different venting

arrangements than natural draft, lower efficiency boilers.

THE FOLLOWING INSTRUCTIONS MUST BE CAREFULLY

READ AND FOLLOWED IN ORDER TO AVOID ANY HAZ-

ARDOUS CONDITIONS DUE TO IMPROPER INSTALLA-

TION OF THE FLUE GAS VENTING SYSTEM.

The vent piping installation MUST be in accordance with

these instructions and with ANSI Z223.1-latest edition

NATIONAL FUEL GAS CODE, Part 7, Venting of Equipment.

Other local codes may also apply and must be followed.

Where there is a conflict between these requirements, the

more stringent case shall apply.

If this boiler is replacing a boiler which is connected to a

common venting system with other natural draft, gas fired

appliances, the removal of the existing boiler from the vent-

ing system is likely to cause the system to be too large for

proper venting of the appliances remaining connected to it.

At the time of removal of the existing boiler, the test proce-

dure specified in Appendix "A" must be followed.

Figure 5 shows the models, vent sizes, conditions and

requirements for different types of venting.

The use of a vent damper is NOT permitted on this

boiler series.

This manual is related to the following products: