Setting – Sanyo PLC-WL2503 User Manual
Page 51
51
Setting
Standby mode
This function is available when operating the projector via
network.
Network .... Supply the power to the network function even
after turning off the projector. You can turn on/
off the projector via network, modify network
environment, and receive an e-mail about
projector status while the projector is powered
off.
Eco ............ Select Eco when you do not use the projector
via network. The projector’s network function
will stop when turning off the projector.
Refer to the owner’s manual of “Network Set-up and
Operation”.
Note:
• Factory default is
Network.
• When
Eco is selected and the projector is in Stand-by,
the communication of RS-232C serial port is not
available.
Timer left before Lamp is
off.
Power management
For reducing power consumption as well as maintaining
the lamp life, the Power management function turns off the
projection lamp when the projector is not operated for a
certain period.
Select one of the following options:
Ready .................. When the lamp has been fully cooled
down, the POWER indicator changes
to green blinking. In this condition, the
projection lamp will be turned on if the
input signal is reconnected or any button
on the remote control is pressed.
Shut down .......... When the lamp has been fully cooled
down, the power will be turned off.
Off ....................... Power management function is off.
Timer ................... If the input signal is interrupted and
no button is pressed for more than
30 seconds, the timer display with
No
signal appears. It starts the countdown
until the lamp is turned off. Use the Point
▲▼
buttons to set the Timer (1~30Min).
Note:
Factory default is
Ready: 5 Min.
Power management