Flow of installation, Function of the network board, Installation and network configuration – Sanyo POA-MD13NET2 User Manual
Page 100
12
Chapter 2 Installation
The following are instructions for attaching this product to the projector and connect-
ing it to the network. Please review the entire procedure to become familiar with it.
Function of the Network Board
(
☞ p.13)
1
Installation and network configuration
(
☞ p.14-20)
2
Set up is completed.
Check the contents of a package. This product contains a network board,
owner’s manuals (2 books), a ferrite core and 2 screws. Also check the name
and function of each part.
Flow of installation
The preparation to control the projector connected to the network is completed. At the
next step, set up and control the projector via the network by using the web browser
installed on your computer. Please see chapter 3 “Basic setting and operation”. (
☞ p.21)
1
Mount this product onto the projector.
2
Connect the LAN cable and join it to the network.
3
Configure the network of the Network Board.
4
Set the password.