beautypg.com

IBM 8260 User Manual

Page 20

background image

For each LOGICAL LINK in v2.x.x (if VPI was not equal to 0) you must define a VPC
link in v3.1.0 :

1. To set your new VPC_LINKS, YOU NEED THE V2.X.X PARAMETERS YOU
HAVE WRITTEN DOWN IN STEP 6.
example for old CLUSTER 1 HUB b (figure2), now PEER GROUP 1,HUB b (fig 3):

The VPI on the LOGICAL LINK 3.1 was 3.
Use VPI 3 to set up the new VPC_LINK.
HUBb>SET VPC_LINK 3.1 3 ENABLE IISP USER BANDWIDTH:85000

--- REACHABLE ADDRESS SETTING : -------------------------------------------

After having completed the swap, you lose your STATIC ROUTES and LOGICAL
LINKS

o Define the reachable address over the IISP link with your old static route and your
old VPI.

example for PEER GROUP 1 HUBb (figure3):
HUBb>SET REACHABLE_ADDRESS
3.1 96 39.99.99.99.99.99.99.00.00.77.77.02 VPI:3
3.1 96 39.99.99.99.99.99.99.00.00.88.88.03 VPI:3

o Check that your reachable address is active (Y) with the command:
example for PEER GROUP 1 HUBb (figure3):
HUBb>SHOW REACHABLE_ADDRESS 3.1

Installation Instructions



Copyright IBM Corp. 1998

Page 20

June 17 1998

EC : F34705

PN : 26L0227