beautypg.com

Operation, 1 power on – IBM DCS9550 1S1 User Manual

Page 48

background image

Operation

IBM System Storage DCS9550 1S1 Storage Expansion Unit Installation, Service, and User Guide

33

3

Operation

Before powering up the enclosure please ensure that all the modules are firmly seated in their

correct bays.

3.1

Power On

Caution

Do not operate the subsystem until the ambient temperature is within the
specified operating range. If the drives have been recently installed ensure
they have had time to acclimatize before operating them.

Note

Please refer to Section h2-Heading for details of the Ops Panel LEDs and
related fault conditions.

Follow the procedure below to Power On the enclosure.

1

Apply AC Mains power to the enclosure. Turn the Power Supply modules to ON.

2

On the Ops Panel, the Audible Alarm beeps once, all LEDs flash for 7 seconds then the Alarm

double beeps.

3

All LEDs on the Ops Panel should be lit (Green) when the enclosure power is activated (and

the disk drive motors should start).

Note

All LEDs on the Ops Panel should be lit Green at power up to indicate that
the system is functioning correctly. If any show Amber then a problem
exists.

If mains power is lost for any reason, on restoration of power the enclosure will re-start

automatically.