beautypg.com

MITSUBISHI ELECTRIC MUZ-FD09NA- U1 User Manual

Page 27

background image

27

Press OPERATE/STOP (ON/OFF) button of the remote

controller (the set temperature is displayed) with the

remote controller headed towards the indoor unit. 1

Expansion valve operates in full-opening direction.

OK.

NOTE

: After check of LEV, do the undermentioned operations.

1. Turn OFF the power supply and turn ON it again.

2. Press RESET button on the remote controller.

1. Regardless of normal or abnormal condition, a short beep

is emitted once the signal is received.

Measure each voltage between connector

pins of CN724 on the inverter P.C. board.

1.Pin (-) — Pin (+)

2.Pin (-) — Pin (+)

3.Pin (-) — Pin (+)

4.Pin (-) — Pin (+)

Is there about 3 ~ 5 VAC between each?
NOTE

: Measure the voltage by an analog

tester.

Properly fi x the LEV coil to the expansion valve.

Replace the inverter P.C.

board.

Replace the LEV coil.

Replace the expansion valve.

Is LEV coil properly fi xed to

the expansion valve?

Does the resistance of LEV

coil have the characteristics?

(Refer to 10-4.)

Do you hear the expansion valve "click,

click·······"?

Do you feel the expansion valve vibrate

on touching it ?

Turn ON the power supply.

While pressing both OPERATION SELECT button

and TOO COOL button on the remote controller at the

same time, press RESET button.

First, release RESET button.

And release the other two buttons after all LCD except

the set temperature in operation display section of the

remote controller is displayed after 3 seconds.

Yes

No

No

Yes

No

Yes

No

Yes

K Check of LEV (Expansion valve)

This manual is related to the following products: