beautypg.com

5 setting the air specifi cations, 6 maintenance by the installer – MTD -ERV 350 User Manual

Page 38

background image

4

34 Instructions for the Installer

Position ABSENT

15%

Position LOW

35%

Position MEDIUM

50%

Position HIGH

70%

The standard settings of the ComfoAir 350, HL, are
as follows:

" and "

".

Wait until "InR" appears on the CC Ease
display.

4.5 Setting the Air Specifi cations

The MTD-ERV 350 must be set after installation.

This can be performed using the air specifi ca-
tions of the MTD-ERV 350 shown above.

v

sponds to the presetting of the G 90.

v

sponds to the presetting of the G 91.

The standard settings of the MTD-ERV 350, nL,
are as follows:

fi

i

c

e

p

s

r

i

a

0

5

3

e MTD-ERV

h

t

e

s

U

cation

diagram for setting the fans.

If the previously set air volumes still differ
too much:

Adjust the valves further.

Check the whole system again after adjustment
of all the valve stages.

Switch the MTD-ERV 350 (back) to ventilation
position 2.

4.6 Maintenance by the Installer

As installer you have to service the MTD-ERV 350 as
follows:
• Inspect the heat exchangers and fans
• Clean the fi lter if a preheater is installed.

These measures are described in more detail briefl y
in the following sections.

Position ABSENT

15%

Position LOW

40%

Position MEDIUM

70%

Position HIGH

90%

To set the MTD-ERV 350 (after installation), proceed
as follows:

Switch the MTD-ERV 350 to the setting mode.

Press simultaneously for two seconds on
"

r

e

t

a

e

h

e

r

p

d

n

a

s

s

a

p

y

b

,

e

d

o

m

g

n

i

t

t

e

s

n

I
are always deactivated. The MTD-ERV
350 switches the setting mode off again
automatically after 30 minutes.

Close all windows and outside doors.

Close all inside doors.

Check the presence of air circulation systems in
the building (at least 12 cm

2

per l/s).

d

e

m

r

o

f

r

e

p

t

o

n

e

r

a

s

e

r

u

s

a

e

m

e

s

e

h

t

f

I
(regularly), there is a danger that the
MTD-ERV 350 will cease to function cor-
rectly.

4.6.1 Inspection of Heat Exchanger and

Fans

The fans and the heat exchanger must be inspected
every 4 years.

Remove the mains plug (A) from the plug sock-
et.

Pull the fi lters (B) out of the MTD-ERV 350.

Remove the front plate by removing the screws
(C).

Push the front plate in the direction of the ar-
row and remove it from the MTD-ERV 350.

Remove the sealing plate by removing the
screws (D).

-

d

li

u

b

e

h

t

n

i

s

m

e

t

s

y

s

n

o

i

t

a

l

u

c

r

i

c

r

i

a

e

h

T


ing must achieve at least 12 cm

2

per l/s.

Check whether both fans function in the
three speed ranges.

Switch the MTD-ERV 350 to the high position.

Install all the valves and set them according to
the instructions or as in the reference dwelling.

If no data are known:

Install the valves and open them as far
as possible.

Measure the air volumes, fi rst the supply air
and then the exhaust air.

differ by more than approx. 10% from the
nominal air volumes and the majority of
the deviations are in the plus range,

adjust

the fan so that all the deviations are in the
plus range. If the majority of the deviations
are in the minus range,

adapt all the devia-

tions so that they are all in the minus range.
Ensure also that a supply and an exhaust
valve remain fully open.

Change the fan settings in the P menus P30 to
P37 via the CC Ease operating unit.

Select the lowest possible setting in or-
der to minimise energy consumption.

Ensure that the ratio of the air volumes be-
tween high, medium and low remains the
same.

This manual is related to the following products: