beautypg.com

Installation instructions, Commissioning – Stovax 8455 User Manual

Page 18

background image

18

1. COMMISSIONING

1.1 Close all windows and doors to the room, check all controls,

and allow fire to burn on maximum for 5 minutes. Test for

spillage of flue products using a smoke match. For standard

VFC fires, pass the lighted smoke match along the top front

edge just inside the opening or canopy. For the RD VFC only,

hold the lighted smoke match centrally inside the flue

opening. See Diagram 1 for Radiant fires and 2 for Convector

fires.

1

AR0187

2

AR0179

1.2 If the fire spills, run for a further 10 minutes and re-check. If

there is still spillage, disconnect the fire and seek expert

advice.

1.3 If there are extractor fans in the room or adjacent rooms, the

spillage test must be repeated with the extractors running on

maximum.

1.4 For RD VFC: If spillage is detected and no air vent is fitted in

the room, re-check for spillage with a window slightly open. If

this cures the spillage, it will be necessary to fit a vent.

IF SPILLAGE PERSISTS, DISCONNECT THE APPLIANCE AND

SEEK EXPERT ADVICE.

For future reference record the installation details on the

commissioning sheet on page 3 of these Instructions.

INSTALLATION INSTRUCTIONS

COMMISSIONING