Installation instructions, Installation, Arrangement of fuelbed components – Stovax 8455 User Manual

Page 14

background image

11

AR0303

5.13 Fit the fret to the fire front using the two securing screws. See

Diagram 12.

12

AR0311

5.14 If the appliance is fitted with an alternative Gazco front

please refer to the separate leaflet supplied with the front.

6. ARRANGEMENT OF FUELBED

COMPONENTS

ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS

The fuel effect and side panels in this appliance are made from

Refractory Ceramic Fibre (RCF), a material which is commonly

used for this application. Protective clothing is not required when

handling these articles, but we recommend you follow normal

hygiene rules of not smoking, eating or drinking in the work area

and always wash your hands before eating or drinking.

To ensure that the release of RCF fibres are kept to a minimum,

during installation and servicing a HEPA filtered vacuum is

recommended to remove any dust accumulated in and around the

appliance before and after working on it. When servicing the

appliance it is recommended that the replaced items are not

broken up, but are sealed within heavy duty polythene bags and

labelled as RCF waste.

RCF waste is classed as stable, non-reactive hazardous waste and

may be disposed of at a licensed landfill site.

Excessive exposure to these materials may cause temporary

irritation to eyes, skin and respiratory tract; wash hands thoroughly

after handling the material.

14

INSTALLATION INSTRUCTIONS

INSTALLATION

5.6 Carefully fit the convector box, feeding the piping through into

the box. Secure the box to the wall, through the flange or base

ensuring that the box is square in the opening. Any

undulations or gaps between the convector box and the wall

should be filled with a non-combustible material. Do not use

silicone as it makes future removal almost impossible.

5.7 Refit the fire assembly and front air guide back into the

convector box. See Diagram 9.

AR0314

9

5.8 HAVE YOU PURGED THE GAS SUPPLY PIPES.

This is essential to expel any foreign matter that might get

blown into the valve assembly causing blockages.

5.9 Connect the 8mm gas supply pipe to the fire. See Diagram

10.

10

AR0944

5.10 Check the gas connections to the fire are sound. Light the fire

and check all joints on the appliance.

5.11 Check the appliance working pressure is correct. See

databadge.

5.12 Fit the fire trim to the convector box. See Diagram 11.