beautypg.com

Guardian Technologies 4758 User Manual

Page 12

background image

SECTION 1.2

PREPACKAGED INSTALLATION BASICS

GENERAL INFORMATION

POWER SOURCE AND LOAD LINES

The utility power supply lines, the standby (generator)
supply lines, and electrical load lines must all be
connected to the proper terminal lugs in the transfer
switch. The following rules apply:In 1-phase systems
with a 2-pole transfer switch, connect the two utility
source hot lines to Transfer Switch Terminal Lugs N1
and N2. Connect the standby source hot lines (E1,
E2) to Transfer Switch Terminal Lugs E1 and E2.
Connect the load lines from Transfer Switch Terminal
Lugs T1 and T2 to the electrical load circuit. Connect
UTILITY, STANDBY and LOAD neutral lines to the
neutral block in the transfer switch.

SYSTEM CONTROL INTERCONNECTIONS

Prepackaged home standby generators are equipped
with a terminal board identified with the following
terminals: (a) UTILITY 1, (b) UTILITY 2, (c) 23, and (d)
194. Prepackaged load centers house an identically
marked terminal board. When these four terminals are
properly interconnected, dropout of utility source
voltage below a preset value will result in automatic
generator startup and transfer of electrical loads to the
"Standby" source. On restoration of utility source
voltage above a preset value will result in retransfer
back to that source and generator shutdown.

PART 1

Figure 2. Proper Fuel Installation

Page 1-2.3

This manual is related to the following products: