beautypg.com

Guardian Technologies 4758 User Manual

Page 117

background image

SECTION 4.4

DIAGNOSTIC TESTS

PART 4

Figure 33. Battery Charge Relay Test Points

TEST 67 - CHECK BATTERY CHARGE RELAY

(BCR)

DISCUSSION:

The battery charge relay is used to switch the AC
source delivered to the battery charger. When the
BCR is de-energized, the Normally Closed (NC)
contacts deliver AC power from the transformer.
When the BCR is energized by Wire 14, the Normally
Open (NO) contacts close and battery charge winding
AC source is delivered to the battery charger.

PROCEDURE:

1. See Figure 33. Disconnect all wires from the battery

charge relay, to prevent interaction.

2. Set a VOM to its "R x 1" scale and zero the meter.

3. Follow the chart below and test each set of contacts.

Connect the VOM test leads to the relay terminals
indicated in the chart provided below.

4. To energize or de-energize the relay. Connect a jumper

wire to a positive (+)12VDC source and to relay
Terminal "A". Connect a jumper wire to the negative (-)
12VDC source and to relay Terminal "B". The relay will
ENERGIZE. Disconnect the positive jumper from
Terminal "A" of the relay and the relay will DE-
ENERGIZE.

RESULTS:

1. Replace the battery charge relay if it fails any of the

steps in this chart.

2. If the BCR tests good, but still does not function during

generator operation, check Wire 14 and Wire 0
connected to the BCR.

a. Set a VOM to measure DC volts. Disconnect

Wire 14 from BCR Terminal A. Connect the
positive (+) test lead to Wire 14. Connect the
negative (-) test lead to a clean frame ground.
Set the AUTO-OFF-MANUAL switch to
MANUAL. Battery voltage should be measured.
If battery voltage is not measured, repair or
replace Wire 14 between the BCR and the 4-tab
terminal block.

b. If voltage was measured in a, set the VOM to

measure resistance. Disconnect Wire 0 from
BCR Terminal B. Connect one test lead to Wire
0. Connect the other test lead to a clean frame
ground. CONTINUITY should be measured. If
CONTINUITY was not measured, repair or
replace Wire 0 between the BCR and the ground
terminal.

TEST 68 - CHECK BATTERY CHARGE

WINDING HARNESS

DISCUSSION:

This test will check the continuity of Wire 66 and Wire
77 between Connector C2 and the battery charge
relay.

PROCEDURE:

1. Disconnect Connector C2 from the side of the control

panel.

2. Disconnect Wire 66 from Terminal 6, and Wire 77 from

Terminal 4 of the BCR.

3. Set a VOM to measure resistance.

DC CONTROL

Page 4.4-20

This manual is related to the following products: