Installation, Metal square double dial clock installation – American Time AllSync Plus User Manual
Page 13
13
© American Time
AllSync Plus Clock Installation
& Operation Manual
Glossary
Appendix B LED
Illumination
Appendix A
Specifications
Tr
oubleshooting
General
Operation
Installation
Intr
oduction
Installation
Metal Square Double Dial Clock Installation
Warning:
The AllSync Plus metal square double dial clock should be mounted according to these instructions to
meet UL clock listing.
1. Remove the AllSync Plus square metal double dial clock from
packaging.
2. Remove box plate from clock by removing acorn nuts at the base of the
clock. Pull wall wiring through plate hole and attach to electrical box.
3. Using UL approved wire nuts, make connections between flying leads
and wiring inside back box.
a. Black wire should be connected to hot (run) wire from the master.
b. Red wire should be connected to the correction line from the
master clock.
c. White wire should be connected to the neutral line.
d. Green wire should be connected to earth ground.
Note: All wiring connections should be made in accordance to local and
national electrical codes
4. Bundle wires inside electrical box.
5. Connect clock to box plate using acorn nuts removed in step 2.