Informations – IKA C 1 Package 1/10 User Manual
Page 33

33
Change seal:
1 In the Menu Maintenance press „change seal“ button. This
requires oxygen pressure be present at C1.
2 Unscrew the piston (Pos. 38 III) with screwdriver
counterclockwise
3 Remove the O-ring (Pos. 38 VI)
4 Put new O-ring on piston (Pos. 38 VI)
5 Screw in piston and tighten securely
6 „Change seal“ button again actuate pistons move to the
home position
38
38
III
Stirrer test
The stirrer is switched on and off for a visual check.
O
2
System blow:
1 Lift out the inner vessel from the bottom and set aside
2 After about 20 seconds the button „O2 system blow“ button.
Keep openings with a paper towel or similar covered by hand
3 After about 3 seconds, this state switches itself off again.
This any remaining condensed water and dirt is
in the line blown out.
This screen shows:
•
the software and firmware version
•
the serial number of the device
•
the date of the last service
•
the date of the last pressure test
•
the number of performed ignitions
•
the number of ignitions in the next pressure test must be
performed
•
the number of performed ignitions and support information
•
IKA - Contact information
blow
O-ring
(Water inlet valve
seal)
Informations
Stirrer
Servo up
The locking pin is extended.
Servo down
The locking pin is retracted.
VI (
8,0x2,5)
C1 092014
locking pin