beautypg.com

Veris Technologies 3150 Soil EC Mapping System - Operating Instructions User Manual

Page 19

background image

Pub. # OM17-EC

3-1

Section 3

Implement Overview and Set-up (3100 shown)

Figure 1.

If the unit is crated, the tongue must be installed prior to use. To do so, please take precautions to
ensure that the framework is properly supported to ensure safety.

1) Remove bands that attach tongue and framework to shipping pallet.

2)

Use a forklift or small loader to raise front portion of tongue into level position and properly
support with a sawhorse or other support of your choice.

Figure 2.


Ratchet for
raising/lowering

Signal Cable quick-
connect coupler port

Jack location for
implement storage

Weights

Road kit: stop, turn,
and clearance lights

Coulter
electrodes

Tongue

Implement
hitch (2” ball)

Jack location for
field operation

Rockshaft and
frame

4-bolt hubs and P205
R75 highway tires

Support
here