WATER TEST THE SYSTEM
Allow the silicone sealant and any finished wall
materials or grout to fully cure before proceeding.
Follow all manufacturer's recommendations
regarding water exposure to their products as well
as product cure times.
Make sure all PVC union connections are securely
hand tightened, and that all union connections use
an OĆring.
Fill the footbath basin at least 3Ćinches above the
top of the suction cover.
Turn on the BodySpa for about five minutes, and
check all visible connections for leaks.
Turn off the BodySpa.
Open the tower, and inspect all piping connections
for leaks.
Check the connections on the back surface of the
face wall, and check all wall and floor joints for
leaks.
Close the tower. Thread in and securely wrench
tighten two 3/8Ćinch bolts. Do not overtighten.
CLEANĆUP AFTER INSTALLATION
Clean the Custom BodySpa room with a mild,
nonĆabrasive detergent and warm water. Do not use
abrasive cleansers.
Remove stubborn stains and paint from the tower
surfaces with turpentine or paint thinner. Remove
dried plaster by carefully scraping with a dullĆedged
piece of wood. Do not use metal scrapers, wire
brushes, or other metal tools. Remove residual
plaster by applying a powderĆtype detergent to a
clean, damp towel to provide mild abrasive action.
Check Point #10
-
Ensure that all connections are securely tight.
-
Fill the footbath basin with water to 3Ćinches over the top of the
suction cover.
-
Run the bodyspa, turn off, and drain the water. check for leakage.
-
Open the tower, inspect for leakage, and close and secure the
tower.