beautypg.com

1 order of information – IBM Switch 9077 User Manual

Page 92

background image

Installation and Configuration

74

Figure 30. Connecting the GRF Console

• The IBM SP system is up and operating.

• The SP system administrator has given you one of these pieces of

information:

• The node number assigned to each SP Switch Router Adapter card to

be attached to an SP Switch port

• The port location on each SP Switch reserved for specific SP Switch

Router Adapter cards

3.2.1 Order of Information

Here is the sequence of steps you have to complete:

1. An installation overview of tasks involving the SP Switch Router, the SP

Switch Router Adapter card, and the SP system

2. The configuration procedure for the PCMCIA 520 MB disk, which also

initiates system logging

3. A description of which cables to attach between the SP Switch Router and

the SP control workstation, and between the SP Switch Router Adapter
card and the SP Switch

Terminal Settings

9600 baud
No parity
Eight data bits
One stop bit

GRF 400

VT100

terminal

GRF Console (optional)

RS232
(Null
Modem
Cable)

Admin Ethernet

(de0)

cws

Crosspoint

Switch

IP Switch

Control

Board

SP Switch