beautypg.com

IBM Switch 9077 User Manual

Page 72

background image

54

IBM 9077 SP Switch Router: Get Connected to the SP Switch

Figure 21. Action Menu

• View

This will bring up the IP Node’s hardware notebook, shown in the next
figure.

• Fence/Unfence...

This will bring up another window to allow us to either fence or unfence an
IP Node. If we are fencing the IP Node, we can use the option of autojoin.

• Create Node Group...

This will bring up another window to allow us to add the RS/6000 SP
nodes to a Node Group. This action does not affect the IP Node, even
though it is selectable.

• 3 Digit Display

1

2

3

4