beautypg.com

Complete condensate drain connections, Complete condensate drain connections (cont), Install unit to plenum – GE Zoneline UltimateV10™ 8,900 BTU Vertical Terminal Air Conditioner Owners Guide User Manual

Page 19

background image

49-5000561 Rev. 2

INST

ALLA

TION INSTRUCTIONS

Installing the Zoneline

4. Complete Condensate Drain

Connections

$QH[WHUQDORUDQLQWHUQDOGUDLQPXVWEHDWWDFKHGWR

the primary drain connector. A secondary drain is
supplied if required by state and local codes. Refer
to the local codes for proper installation of the drains.

,IWKHVHFRQGDU\GUDLQLVQRWXVHGVHDOLWVGUDLQSRUW
ZLWKD´)137SOXJ

Drain Overview

Internal Drain (Primary)

Secondary Drain

,IQRWXVHGVHDOZLWK
Dñ»๞´)137SOXJ

Primary Drain

Run condensate line to
building interior drain
line with proper venting
according to local
building codes.

Drain line connection
to right of platform

4. Complete Condensate Drain

Connections (cont)

External Drain (Secondary)

Refer to drain platform instruction

manual for drain installation

,IQHFHVVDU\H[WHQG

secondary drain line though
the plenum and grille.
Use a pipe connector and
additional piping to ensure

GUDLQSLSHH[WHQGVSDVWWKH

outdoor grille.

([WHQGVHFRQGDU\

drain pipe into plenum
or through outdoor
grille. Grille must be
modified to allow drain
line to pass through.

Primary
Drain

5. Install Unit to Plenum

Align the unit with plenum opening and slide unit
toward plenum to ensure it is seated properly with the
drain platform.

Unit

Wall
Plenum

Drain
Platform