Attach the fiber labeled 2 to the applicable tr, At the other end of the fiber optic cable, atta, Attach the fiber labeled 2 to the receive port – Enterasys Networks BRIM-E6 User Manual
Page 23: Check that the epim’s lnk led is on. if the led, A. check that the power is turned on for the devic, B. verify proper “receive to transmit” connection, C. verify that the fiber connection meets the db l, 3 connecting a thin-net segment to an epim-c, Set the internal termination switch to the righ
