2 rackmount installation, Rackmount installation -4, Tabletop or shelf installation – Enterasys Networks 2H252-25R User Manual
Page 30: Section 3.3.2, Describes the, N in, Figure 3-1, Guidelines for the rackmount installation, Reset
![background image](/manuals/85886/30/background.png)
Installing the Device
3-4
Installation
Figure 3-1
Tabletop or Shelf Installation
3.3.2
Rackmount Installation
To install the 2H252-25R in a 19-inch rack, Enterasys Networks includes a strain-relief bracket for
cable management and an accessory kit containing the rackmount brackets, and mounting screws
to attach the rackmount brackets and strain-relief bracket.
Guidelines for the Rackmount Installation
The installation site must be within reach of the network cabling and meet the requirements listed
below:
•
An appropriate grounded power receptacle must be located within seven feet of the location.
•
Maintain a temperature of between 5
°C (41°F) and 40°C (104°F) at the installation site with
fluctuations of less than 10
°C (18°F) per hour.
4005_00_02
A = 15 cm (6 in)
B = 57 cm (22.5 in)
C = 53 cm (21 in)
C
B
A
D
D = 213 cm (7 ft)
1
2
3
4
5
6
7
8
9
10
15
16
21
22
23
24
11
12
19
20
17
18
13
14
2H252-25R
COM
PWR
CPU
RESET
2X 4X 6X 8X 10X 12X 14X 16X 18X 20X 22X 24X
LED
MODE
RX-TX
DPX-SPD
FAST ETHERNET WORKGROUP SWITCH