Installing shading hood (optional step), Landscape installation, Prepare for the shading hood installation – BenQ PhotoVue SW272U 27" 4K HDR Monitor User Manual
Page 32: Install the right hoods
32
Installing shading hood (optional step)
You can find the carved arrows on the inner side of some plates. Refer to the installation
requirements and the printed marks to prepare the plates needed for landscape and
portrait installation separately.
Landscape installation
Plates required for landscape installation:
• Some models may come with shading hood for landscape installation only. Check the package contents
of the purchased model.
• To prevent glare or most of unwanted reflections from other light sources off your screen, you can install
the shading hood (provided or purchased separately, depending on the product supplied for your region).
• If you want to work with more than one hooded monitor, check out shading hood bridge (HB27) from BenQ
HB27
.
• Please be careful to prevent damage to the shading hood and the monitor. Different pieces of shading
hood are well-designed and can fit into your monitor properly. Do not use excessive force when installing
the shading hood to avoid possible damage.
• Avoid finger pressure on the screen surface.
More about HB27
1. Prepare for the shading hood
installation.
Place the monitor upright on its stand on a flat
even surface. Make sure the monitor is rotated to
the landscape mode.
Follow the illustrations to complete the
installation carefully.
2. Install the right hoods.
Align the arrow on plate (Rt) with the one on plate
(R2) and attach them together. Slide plate (Rt) to
the end as illustrated.
L2
R2
Lt
Rt
top plate
Rt
R2