Primary inspection, General inspection – RIGOL DG1000 Series User Manual
Page 9
RIGOL
Quick Guide for DG1000
1
Primary Inspection
General Inspection
1. Inspect the shipping container for damage.
Keep the damaged shipping container or cushioning material
until the contents of the shipment have been checked for
completeness and the instrument has passed both electrical
and mechanical tests.
The consigner or carrier shall be liable for the damage to
instrument
resulting from shipment.
RIGOL would not be
responsible for free maintenance/rework or replacement of
the unit.
2. Inspect the instrument.
The front/rear panel are shown as follows. In case of any
damage, or defect, or failure, notify your
RIGOL Sales
Representative.
3. Check the accessories.
The standard accessories supplied with the instrument are
listed as follows. If your contents are incomplete or damaged,
please notify your
RIGOL Sales Representative.