beautypg.com

Primary inspection, General inspection – RIGOL DG1000 Series User Manual

Page 9

background image

RIGOL

Quick Guide for DG1000

1

Primary Inspection

General Inspection

1 Inspect the shipping container for damage.

Keep the damaged shipping container or cushioning material
until the contents of the shipment have been checked for
completeness and the instrument has passed both electrical
and mechanical tests.

The consigner or carrier shall be liable for the damage to
instrument

resulting from shipment.

RIGOL would not be

responsible for free maintenance/rework or replacement of
the unit.

2 Inspect the instrument.

The front/rear panel are shown as follows. In case of any
damage, or defect, or failure, notify your

RIGOL Sales

Representative.

3 Check the accessories.

The standard accessories supplied with the instrument are
listed as follows. If your contents are incomplete or damaged,
please notify your

RIGOL Sales Representative.