Press setup key to begin, Setup and programming, Overview – Precision Digital PD941 User Manual
Page 21

ConsoliDator Multi-Channel Controller
Instruction Manual
21
SETUP AND PROGRAMMING
There is no need to recalibrate the instrument when first 
received from the factory. 
The device is factory calibrated prior to shipment, for all 
input types. The calibration equipment is certified to NIST 
standards. 
Overview
Setup and programming are done 
through the front buttons or ConsoliDator 
Monitor Software. After power and signal 
connections have been completed and 
verified, apply power to the instrument. 
Inputs, outputs, and relays are 
configured individually. It is 
recommended that all inputs be 
configured before outputs and relays are 
programmed. 
Shown to the right is a typical screen that 
appears upon first power-up. Actual 
screens will vary with the amount of 
inputs initially detected. 
For information on button functions, see 
NAVIGATING AND EDITING (page 20.) 
To load software and program from a 
PC, please familiarize yourself with the 
ConsoliDator Monitor Software 
(page 52) before you continue with 
device setup. 
SETUP
AUTO
ACK
NEXT
Ch1
Ch2
Ch3
Ch4
Ch 1:
Ch 2:
Ch 3:
Ch 4:
13.000
14.000
15.000
mA
mA
mA
mA
mA
12.000
 
 
 
 
 
 
 
 
Press SETUP key to begin.
