Electrolux FOM 71 CLS User Manual
Page 57

13:1
Installation inspection of the reference machine
FOM 71 MP-Lab
Installation inspection of the reference machine
Before carrying out any major test series, inspect the installation and
check the following items:
• In order to make installation and servicing the machine easier, the fol-
lowing clearances are recommended:
o At least 500 mm between the machine and the wall behind.
o A minimum clearance of 250mm at the sides between the machine
and a wall or other machine, where more than one machine is instal-
led.
• Check the mounting bolts to the floor, as in this type of machine the
drum is attached directly to the frame. As a result, the floor under the
machine must be stable enough to absorb the dynamic forces genera-
ted during the spin cycles. For fastening details see the Operating and
installation manual for FOM 71 MP-Lab.
• Check the levelling of the machine. The vertical difference from corner
to corner of the top lid shall not exceed 5 mm. If this is not the case,
adjust the feet of the machine.
• The machine must be connected using the supplied Y hose or two
single hoses.
• Check that the amount of supply water at the water connection to
the reference machine is sufficient and in line with the specification in
the standard (15 ± 2 litre) and that the amount can be maintained in
all circumstances. Water pressure at the machine's water intake must
never fall below 100 kPa.
• Check that the power supply is compliant with the voltage specified
on the reference machine's data label and within the tolerances of the
standard (± 2%).
• Make sure that the power supply can maintain the required voltage
level whilst the reference machine is heating.
Bild 13_1.jpg