Operation – MCZ Vivo 80 Pellet Comfort Air - 2012 User Manual
Page 31

Pellet
29
4-OPERATION
Technical Dept. - All rights reserved - Reproduction is prohibited
It is extremely important to make sure the product is not immediately overheated and the temperature is increased gradually starting
from the low power.
This will prevent damaging the welds and the steel structure.
DO NOT EXPECT HEATING EFFICIENCY IMMEDIATELY!!!
LOADING THE PELLETS
Fuel is loaded from the side or front door, which is to be fitted on the cladding, which provides access to the fuel loading chute.
The loading procedure is facilitated if performed in a number of steps as described below:
• Open the door and pour half the contents on the chute directly from the bag or using the supplied spade (A)
• Push the pellets accumulated in the chute towards the hopper using the supplied tool (B) and distribute them uniformly.
• Complete the operation by pouring the second half from the bag in the same way
No other type of fuel other then pellets, in compliance with above-mentioned specifications, is to be inserted into
the hopper.
SPADE