beautypg.com

Installation and assembly – MCZ Vivo 80 Pellet Comfort Air - 2012 User Manual

Page 29

background image

B

B

B

B

C

27

3-INSTALLATION AND ASSEMBLY

Technical Dept. - All rights reserved - Reproduction is prohibited

ASSEMBLING THE COMPENSATION FRAME

Once the cladding and/or the plasterboard is set up, fit the previously removed compensation frame.

This frame intends to finish and cover the gap between the metal structure of the product and the cladding.

The frame is assembled by simply opening the door of the product, fitting in the frame as shown in the figure and fastening it to the lateral

columns of the structure, inside the door profile, with the four screws supplied.

C = FRAME

B = SCREW