Installation and assembly, Fitting the chute at the side – MCZ Vivo 80 Pellet Comfort Air - 2012 User Manual
Page 23

05
.
NI
M
800 MAX
590 MIN
800 MAX
590 MIN
04
5
440
03
2
41
9
00
5
145
00
5
41
9
03
2
50
min.
21
3-INSTALLATION AND ASSEMBLY
Technical Dept. - All rights reserved - Reproduction is prohibited
FITTING THE CHUTE AT THE SIDE
If the chute is to be placed at the side, the distance from the axis of the machine to the wall must not exceed 80 cm (figure at the side).
Proceed as follows to set the chute in place:
• Connect the supplied pipe to the Vivo 80 Pellet, making sure it is turned sideways, and fasten it with the clamp.
• Connect the pipe (upper part) to the opening of the door structure with the supplied clamp.
• Position the pipe with the door structure in such a way that, once the cladding is installed, the pipe can be tightened and fixed to the
wall of the cladding in line with the hole made for it to be inserted.
• Refer to the relative paragraph to fit the external door, since this is to be carried out once the cladding is completed.
FITTING THE SIDE CHUTE
FITTING THE FRONT CHUTE