Installation and assembly – MCZ Vivo 80 Pellet Comfort Air - 2012 User Manual
Page 20

18
3-INSTALLATION AND ASSEMBLY
POSITIONING
Evaluate the optimal condition of installation before placing the product.
The product can be installed in an existing traditional firebox or as a new system.
Furthermore, an iron support can be purchased separately in order to raise the product to the recommended height, 500 mm, (see the
relative price list of accessories - optional) or build a base on site.
INSTALLING IN AN EXISTING FIREBOX
Evaluate the following elements:
The product support surface must have the following characteristics:
• bear the weight of the product and any accessories
• its texture must allow anchors to be set with dowels for safety purposes
• be perfectly level
• the back panels must be as perpendicular to the surface as possible
The housing compartment must not wide enough for the product to fit in.
After having verified the conditions required for a correct installation, proceed with the product assembly:
• fasten the base of the product to the support surface
• make the various connections to the fireplace in compliance with all the applicable regulations.
Any space between the cladding walls and the product can be closed with a compensation frame that must be easily removed if
maintenance is to be performed on the insert.
It is mandatory for the product to be fastened to the support surface as it may tip over when being extracted.
Verify that all the connections (hydraulic and electrical) allow the product to be extracted.
INSTALLING AS A NEW SYSTEM
Evaluate the following elements:
The product support surface must have the following characteristics:
• bear the weight of the product and any accessories
• its texture must allow anchors to be set with dowels for safety purposes
• be perfectly level
After having verified the conditions required for a correct installation, proceed with the product assembly:
• fasten the base of the product to the support surface
• make the various connections to the fireplace in compliance with all the applicable regulations.
It is mandatory for the product to be fastened to the support surface as it may tip over when being extracted.
Verify that all the connections allow the product to be extracted.
• Proceed with the cladding assembly.