beautypg.com

Optional rack-mounting equipment, Mounting, Rack mounting – Enterasys Networks V2H124-24P User Manual

Page 37: Mounting 3-3, Figure 3-2, Attaching the brackets

background image

Mounting

3-3

3

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following equipment
available:

• Four mounting screws for each device you plan to install in a rack—these are not

included

• A screwdriver (Phillips or flathead, depending on the type of screws used)

Mounting

This switch can be mounted in a standard 19-inch equipment rack or on a desktop or
shelf. Mounting instructions for each type of site follow.

Rack Mounting

Before rack mounting the switch, pay particular attention to the following factors:

• Temperature: Since the temperature within a rack assembly may be higher than

the ambient room temperature, check that the rack-environment temperature is
within the specified operating temperature range. (See page C-1.)

• Mechanical Loading: Do not place any equipment on top of a rack-mounted unit.
• Circuit Overloading: Be sure that the supply circuit to the rack assembly is not

overloaded.

• Grounding: Rack-mounted equipment should be properly grounded. Particular

attention should be given to supply connections other than direct connections to
the mains.

To rack-mount devices:

1.

Attach the brackets to the device using the screws provided in the Bracket
Mounting Kit.

Figure 3-2. Attaching the Brackets

V2H124-24P

26

Link/A

ct

PoE

25

26

PWR

Diag

Stackin

g

Mode

PoE/L

ink

25