beautypg.com

11 inspection, Servopack inspection, Servopack’s parts replacement schedule – Yaskawa Σ-III Series User Manual

Page 20

background image

E-18

11 Inspection

This section describes the SERVOPACK basic inspections and part replacement period.

„

SERVOPACK Inspection

For inspections and maintenance of the SERVOPACK, follow the inspection procedures in
the table below at least once every year.

„

SERVOPACK’s Parts Replacement Schedule

The following electric or electronic parts are subject to mechanical wear or deterioration
over time. To avoid failure, replace these parts at the frequency indicated.

Refer to the standard replacement period in the following table, contact your Yaskawa repre-
sentative. After an examination of the part in question, we will determine whether the parts
should be replaced or not.

The parameters of any SERVOPACKs overhauled by Yaskawa are reset to the factory set-
tings before shipping. Be sure to confirm that the parameters are properly set before starting
operation.

Item

Frequency

Procedure

Remedy

Exterior

At least once a year

Check for dust, dirt, and oil on
surfaces.

Clean with compressed
air or cloth.

Loose screws

Check for loose terminal block
and connector screws.

Tighten any loose
screws.

Part

Standard

Replacement

Period

Operating Conditions

Cooling Fan

4 to 5 years

• Surrounding Air Temperature: Annual average

of 30

°C

• Load Factor: 80% max.
• Operation Rate: 20 hours/day max.

Smoothing Capacitor

7 to 8 years

Relays

Fuses

10 years

Aluminum Electrolytic
Capacitor on Circuit Board

5 years

This manual is related to the following products: