3 startup, Startup, How to start up the inverter – SMA WB 5000 Installation User Manual
Page 32
Installation
SMA
Technology AG
Page 32
WB50_60-11:SE4005
Installation Guide
5.3 Startup
You can start up the Sunny Boy 3800 when
• The AC (mains) cable is connected correctly
• The DC cables are fully connected and the unused DC plug connectors on the
bottom of the enclosure are closed using the protective caps
• The enclosure's cover is securely screwed on
• You are sure that the input voltage cannot exceed 600 V, and
• The DC input voltage is sufficient for supplying the onboard electronics.
How to start up the inverter
1.
First of all, switch the line circuit breaker to the
"on" position.
2.
Now look at the LED display and consult the
table below to check whether the Sunny Boy
3800 is in a fault-free operating status and that
you understand what this status means. Once
the inverter is in a fault-free operating status,
startup has successfully completed.
On!
Off