5 Installation Requirements
For safe operation of the inverter, the installation site must satisfy the following conditions:
• Foundation (load carrying capacity)
• Inverter protection rating / EMC / sound levels
• Minimum workspace requirements (escape routes)
• Ventilation / permissible ambient temperature / air quality / humidity
5.1 Installation Site Requirements
5.1.1 Foundation
The foundation must guarantee solid and safe positioning of the inverter. It must provide the load-
carrying capacity necessary to cope with the weight of the inverter. A foundation slab is required for
ground-mounted installations. Pouring and dimensioning the foundation slab must be performed by
the customer, see Appendix D.
Figure 5.1: Installation of the SC100 Indoor in a building
C
A 1
E
F
D
Sunny Central
H
G
B
F
C
100
SMA
SMA
ventilation system (option customer)
Cable section (option customer)
Cable section (option customer)