5 Installation Requirements

For safe operation of the inverter, the installation site must satisfy the following conditions:

• Foundation (load carrying capacity)
• Inverter protection rating / EMC / sound levels
• Minimum workspace requirements (escape routes)
• Ventilation / permissible ambient temperature / air quality / humidity

5.1 Installation Site Requirements

5.1.1 Foundation

The foundation must guarantee solid and safe positioning of the inverter. It must provide the load-
carrying capacity necessary to cope with the weight of the inverter. A foundation slab is required for
ground-mounted installations. Pouring and dimensioning the foundation slab must be performed by
the customer, see Appendix D.

Figure 5.1: Installation of the SC100 Indoor in a building

C

A 1

E

F

D

Sunny Central

H

G

B

F

C

100

SMA

SMA

ventilation system (option customer)

Cable section (option customer)

Cable section (option customer)

This manual is related to the following products: