Connecting the Meter Box between the Automatic Switch Box and the Sunny Backup:

1. Connect the RJ45 cable of the Automatic Switch Box to the "SyncIn" jack.
2. Connect the RJ45 cable of the Sunny Backup to the "SyncOut" jack.
3. If the Automatic Switch Box is located at the end of the cable route and there is no terminator

attached to the "SyncIn" or "SyncOut" jacks, attach a terminator.

4. If the Sunny Backup is located at the end of the cable route and there is no terminator attached

to the "SyncIn" or "SyncOut" jacks, attach a terminator.

Connecting the Meter Box to the Sunny Backup or Automatic Switch Box:

1. Connect the RJ45 cable of the Sunny Backup or the Automatic Switch Box to the "SyncIn" jack.
2. Plug the terminator into the "SyncOut" jack. Hint: The terminators for the communication cables

are part of the scope of delivery of the Automatic Switch Box and the Sunny Backup.

3. If the Automatic Switch Box is located at the end of the cable route and there is no terminator

attached to the "SyncIn" or "SyncOut" jacks, attach a terminator.

4. If the Sunny Backup is located at the end of the cable route and there is no terminator attached

to the "SyncIn" or "SyncOut" jacks, attach a terminator.