beautypg.com

SMA METER BOX FOR SUNNY BACKUP User Manual

Page 20

background image

6  Electrical Connection

SMA Solar Technology AG

20

METERBOXSBU-IA-en-40

Installation Manual

2. Connect the plug of the reading head of the PV

production meter to the "PV-Meter" jack of the
Meter Box.

3. Place the magnet holder of another reading head

on the upper right of the front side of the grid feed-
in and purchased electricity meter. To achieve this,
the infrared interfaces on the reading head and on
the meter for the grid feed-in and purchased
electricity must rest on top of each other and the
connection cable of the reading head must point
upwards.

4. Connect the plug of the reading head from the grid

feed-in and purchased electricity meter to the
"Grid-Meter" jack of the Meter Box.