Page 17: Connecting the reading heads of the energy meters, Cable route for connecting the reading heads

SMA Solar Technology AG
6 Electrical Connection
Installation Manual
METERBOXSBU-IA-en-40
17
6.2 Connection Area of the Feed-through Adapter
Figure8: Connections of the feed-through adapter
6.3 Connecting the Reading Heads of the Energy Meters
6.3.1 Cable Route for Connecting the Reading Heads
Requirements:
☐ A mono-directional meter or a bidirectional meter is implemented as a PV production meter.
And
☐ A bidirectional meter is implemented as a meter for grid feed-in and purchased electricity.
In order to install the Meter Box outside of the AC main distribution, always observe the following
specifications on the cable route:
• Keep cable route within the main distribution as short as possible.
• Wind up the cables outside of the AC main distribution.
• Keep the largest possible clearance to live conductors and component parts.
E
"SyncIn" jack
Input for communication with the Sunny Backup and the
Automatic Switch Box
F
"SyncOut" jack
Output for communication with the Sunny Backup and the
Automatic Switch Box
Position
Designation
A
Upper jack
B
Front jack "1"
C
Front jack "2"
D
Lower jack
Position
Designation
Explanation