2 connection area of the feed-through adapter, 1 cable route for connecting the reading heads, Connection area of the feed-through adapter – SMA METER BOX FOR SUNNY BACKUP User Manual

Page 17: Connecting the reading heads of the energy meters, Cable route for connecting the reading heads

background image

SMA Solar Technology AG

6  Electrical Connection

Installation Manual

METERBOXSBU-IA-en-40

17

6.2 Connection Area of the Feed-through Adapter

Figure8: Connections of the feed-through adapter

6.3 Connecting the Reading Heads of the Energy Meters

6.3.1 Cable Route for Connecting the Reading Heads

Requirements:

☐ A mono-directional meter or a bidirectional meter is implemented as a PV production meter.

And

☐ A bidirectional meter is implemented as a meter for grid feed-in and purchased electricity.

In order to install the Meter Box outside of the AC main distribution, always observe the following
specifications on the cable route:

• Keep cable route within the main distribution as short as possible.
• Wind up the cables outside of the AC main distribution.
• Keep the largest possible clearance to live conductors and component parts.

E

"SyncIn" jack

Input for communication with the Sunny Backup and the
Automatic Switch Box

F

"SyncOut" jack

Output for communication with the Sunny Backup and the
Automatic Switch Box

Position

Designation

A

Upper jack

B

Front jack "1"

C

Front jack "2"

D

Lower jack

Position

Designation

Explanation