beautypg.com

SMA METER BOX FOR SUNNY BACKUP User Manual

Page 22

background image

6  Electrical Connection

SMA Solar Technology AG

22

METERBOXSBU-IA-en-40

Installation Manual

3. Connect the extension cord for the PV production meter.

• Connect a plug of the extension cord to the

upper jack of the feed-through adapter.

• Connect the other plug of the extension cord to

the "PV-Meter" jack of the Meter Box.

4. Place the magnet holder of another reading head

on the upper right of the front side of the grid feed-
in and purchased electricity meter. To achieve this,
the infrared interfaces on the reading head and on
the meter for the grid feed-in and purchased
electricity must rest on top of each other and the
connection cable of the reading head must point
upwards.