Verifying the installation, Powering on the device – H3C Technologies H3C WX5500E Series Access Controllers User Manual
Page 34
28
Verifying the installation
Before powering on the device, verify that:
•
The correct power source is used.
•
The grounding cable is securely connected.
•
The console cable and power cord are correctly connected.
•
All the interface cables are cabled indoors. If any cable is routed outdoors, verify that the socket
strip with a lightning protector for network ports has been properly connected.
Powering on the device
1.
Power on the device. The device initializes its memory and runs the BootWare. The following
information appears on the terminal screen:
System is starting...
Press Ctrl+D to access BASIC-BOOTWARE MENU
Booting Normal Extend BootWare....
The Extend BootWare is self-decompressing......Done!
****************************************************************************
* *
* H3C WX5540E BootWare, Version 1.01 *
* *
****************************************************************************
Compiled Date : Mar 21 2013
CPU Type : XLP432
CPU Clock Speed : 1400MHz
Memory Type : DDR3 SDRAM
Memory Size : 8192MB
Memory Speed : 1333MHz
BootWare Size : 768KB
Flash Size : 16MB
cfa0 Size : 4002MB
CPLD1 Version : 002
CPLD2 Version : 002
PCB Version : Ver.A
BootWare Validating...
Press Ctrl+B to enter extended boot menu...
2.
Press Ctrl + B at the prompt within 4 seconds to access the Boot menu. Otherwise, the system enters
the system image file reading and self-compressing process.
To access the Boot menu after the system enters the system image file reading and self-compressing
process, restart the device.
Starting to get the main application file--cfa0:/main.bin!...
............................................................