13B. WCC III - MCD2 INSTALLATION GUIDE

WCC III Technical Guide

13B-33

Install-Menu Program

Setup New CrystalFontz 635 Display

(Choice #1)

This function will run the cf-yac clear and set utility that will setup
a new CF-635 lcd display.

First, the CF-635 display will clear and then populate the display
with the basic information displayed at bootup/power-on.

Then, the GPIOs built in to the CF-635 will be programmed to
display the proper LEDs and enable the POWER-ON, RESET,
and POWER-OFF sequences that are used to control the MCD2.

Finally, the settings are all saved to the CF-635’s fl ash memory and
available for immediate use. However, a reboot of the machine and
function test of the POWER-ON, POWER-OFF, and RESET is
recommended at this time.

Restore Backtask DAT Files from

CompactFlash (Choice #2)

This function will allow the user to select the restored fi les from
the daily automatic backup that automatically occurs at midnight
every night. You can select the data restore point by month with the
most current data backup fi les being listed fi rst.

The data is stored on root, under an automatically monthly created
subdirectory system that is based on a year/month. Example:
Subdirectory that is named Dat_2013_08 is realized as August
2013. This automatic safety backup occurs at midnight every night
(The time listed for all of these fi les should be 12:00A.M.) and the
previous day’s data is over written. This continually occurs until the
last day of the month when the WCCIII-MCD will automatically
makes a new subdirectory for the new month.

Apply USB Over-Current HOTFIX and

Reboot (Choice #3)

This function will modify the boot-up parameters to remedy
a known bug with a Linux kernel. The bug will cause an over-
current on USB condition to be logged in the SYSLOG even when
one doesn’t exist. This function will initiate a system reboot after
completion.

Reset {APCUPSD/Webmin/Firewall/

LCDd} to Default Settings

(Choice #s { 4/5/6/7 } )

These functions will reset the various servers back to a fresh
install state. These functions should only be used if instructed by
WattMaster Controls Tech Support. These functions will replace
the fi les and permissions of their respective services and restart
those services with the new confi gurations. Any customization of
those services prior to being reset will be lost.

Create New SSH Server Keys

(Choice #8)

This function will create new SSH server keys for the Secure
Shell (SSH). These are the encryption keys that are used to enable
secure access to the MCD2 via port 22. Any connections to the
MCD2 that have previous keys will need to be cleared. Use this
function only if instructed by WattMaster Controls Tech Support.
A restart is not necessary but the only way to insure that all previous
connections are cleared.

Shutdown and Reboot the MCD

(Choice #9)

This is an immediate shutdown and reboot of the WCCIII-MCD2.
You may not cancel this shutdown command with a “Ctrl” “C”
key sequence.

There are times that occur when you would need to shut down
and then restart the WCCIII-MCD2. This is generally done when
servicing the WCCIII-MCD2 or when you have software updates
to the WCCIII-MCD2.

If you have selected to shut down the MCD2, the following will be
displayed on the screen:

*************************************************

*

Shutdown and Reboot MCD

*

*

*

******************************************

Broadcast message from wcciii@wcciii-mcd

(/dev/pts/0) at 9:01 ...11

The system is going down for reboot NOW!