Quick set-up, Connect to craft port, Connect to craft port -1 – Verilink NCC 2020 (880-503284-001) Product Manual User Manual
Page 15: Chapter

Verilink NCC 2020 User Manual
2-1
Chapter
2
Quick Set-Up
This section details a quick, step-by-step procedure for configuring
the NCC 2020. For this quick configuration guide, the following
assumptions are made:
•
That you are using the NCC 2020 with a single DIU 2130 DSU
module in a Dual-line shelf.
•
That you are dividing the bandwidth of an ESF/B8ZS T1 evenly
between the two data ports of the DIU 2130.
•
That one of the data ports is used for a router and the other
data port is for a time-division multiplexer.
Figure 2-1 Example Configuration
It is most likely that this procedure will not match your
configuration exactly. Use this chapter as a guide to the process of
installing your equipment. Chapter 3 provides complete details on
configuration covering all selectable options.
Connect to Craft
Port
Using the Craft cable supplied with the NCC 2020, connect the
modular (RJ-11) end to the port labeled C
RAFT
on the front panel of
the NCC 2020. Connect the other end of the Craft cable to your PC
or terminal. If your PC has a DB-9 COM port connector, use a
standard PC-AT serial cable to complete the connection.
Set your terminal, or terminal program, to 19.2 kbit/s, 8 data bits,
no parity, one stop bit, and no flow control.
Time Division
Multiplexer
Router
Dual-line Shelf
NCC 2020
DIU 2130
Network Service
Provider