beautypg.com

Typical assembly overview (ets 40ft shown) – Space Ray ETS Series User Manual

Page 19

background image

Form 43343300

-18-

May 2013

8.2)

HEATER ASSEMBLY / JOINING OF TUBE SECTIONS

T

ypical

Assembly Overview

(ETS 40FT

Shown)

4"OD x 10Ft. See sections 7.0 & 7.1 for required tubes.

T

ube Support Bracket

U-Bolt Clamp & 5/16" Hex Nut

s

T

ube Flange

12 Radial Hole for 40-200M BTU unit

s only

6 Hole for 225-250M BTU unit

s only

Wire Hanger

Gasket

Control Box

Draf

t Inducer

Assembly

Gasket

Maximum 6” dist

ance

from control box to the tube support/hanger bracket.

- 9’

¼”

- 10’

- 10’

Not Less Than 10”

#10 Self-Drill Screws (T

ypical all tube support

s

and tube couplings.)

T

ypical

Overlap

Draf

t Inducer

Flange

5 hanging point

s to be used for suspension.

There must be two hanging point

s on the first

tube and one on each of the other tubes

3” (control box to reflector)

2” overlap

1” overlap

1” overlap

This manual is related to the following products: