012 construction leveling blade parts list, Installation instructions, Center attachment – Smithco Sand Star I 45-001 Parts & Service Manual User Manual
Page 90

B-19
Center Attachment
45-012 CONSTRUCTION LEVELING BLADE PARTS LIST
REF#
PART#
DESCRIPTION
QUANTITY
1
HHP-18
Bridge Pin
1
/
8
3
2
HCP-12-200
Clevis Pin
1
/
2
x 2
2
3
45-116
Center Lift Bar
1
4
HNTL-38-16
Lock Nut
3
/
8
- 16
5
5
42-097
Leveling Blade
1
6
HCP-58-250
Clevis Pin
5
/
8
x 2
1
/
2
1
7
HB-38-16-100
Bolt
3
/
8
- 16 x 1
5
INSTALLATION INSTRUCTIONS
1. Bolt leveling blade (Ref 5) to center lift bar (Ref 3) using five
3
/
8
- 16 x 1 bolts (Ref 7) and five
3
/
8
- 16 lock
nuts (Ref 4) as shown on drawing.
2. Attach the center lift bar to amain frame using clevis pin and bridge pin (Ref 1 and 2).
3. Lift center lift bar up or extend cylinder so rod end lines up with the holes on the center of the center lift
bar. Use
5
/
8
x 2
1
/
2
clevis pin and bridge pin (Ref 6 & 1) to fasten
cylinder to cultivator.
4. Turn machine on and test for proper operation.