beautypg.com

Cse60, Installation, Final check – Scotsman CSE60 User Manual

Page 5

background image

CSE60

June 2001

Page 5

LEVEL?

POWER?

WATER?

DRAINS?

INSTALLATION

FINAL CHECK

1. Is the Cabinet level?
2. Have all the electrical and piping connections

been made?
3. Has the voltage been tested and checked

against the nameplate rating?
4. Is the unit plugged into a separate electrical

circuit?
5. Is the water supply line shut off valve installed

and is the water turned on?

6. Have the bin interior, and the cabinet exterior

been wiped clean?
7. Are all internal parts in place, including the

spray platform and curtain?
8. Have the internal refrigerant lines been

checked for rubbing and chaffing?
9. Has the machine been installed where it is

indoors, in a controlled environment, with

adequate air circulation around the machine,

and where it can be serviced?